PROJECT DURATION: TBC
OVERALL PROJECT VALUE: £10.4 million
MECHANICAL & ELECTRICAL VALUE: £3.2 million
M & E MAIN CONTRACTOR: Spie Mathew Hall
CONTROL SYSTEM: Trend Controls
The building environmental control was achieved by using over 300 heating and chilled beams throughout the office spaces and forced air provided from AHU’s with recuperators reclaiming the return heat losses from the spaces. The 2 chiller units were located on the grounds of the complex. A standard boiler plant was installed to supply the load of the building. Due to the sensitive nature of the building a backup generator and UPS system was installed which in turn was monitored by the BMS for faults/alarms and running conditions. 6 riser control panels were installed on each level for ease of installation wiring/commissioning and maintenance with a further 2 main control panels operating the AHU and boiler plant. All panels were networked with a remote front end user point located at a monitoring bureau at a different location. Each panel had a touch screen display so adjustments to the plant could be made locally.
For more information regarding this project, or to discuss your own plans, get in touch.
T: 01458 274317
E: info@heglimited.co.uk