Millfield Swimming Pool

SURVEY WORKS

HEG Ltd were employed to oversee the validation report carried out on the swimming pool at Millfield School.  This involved employing outside consultants within the HVAC industry to carry out measurements of the existing plant to verify potential loading demand problems. This process utilised ultra-sonic, flow and temperature control tests and, in addition, temporary boiler plant was also used to check the original design on AHU heater battery coils to see if they met the design criteria for the volume to be supplied.

Meetings between the client and consultants were initiated by HEG Limited and all reports collated and presented to the client for their review.

 

For more information regarding this project, or to discuss your own plans, get in touch.

T: 01458 274317
E: info@heglimited.co.uk

 

Our Services