PROJECT DURATION: TBC
OVERALL PROJECT VALUE: £22 million
MECHANICAL & ELECTRICAL VALUE: £5 million
M & E MAIN CONTRACTOR: Mitie Engineering
CONTROL SYSTEM: Trend Controls
The building environmental control was achieved by using heating and chilling beams throughout the office spaces with forced air provided from AHU’s with thermal wheels to reclaim return heat losses from the spaces. The 2 x chiller units were located in the basement with a complex heat pump system incorporated. Free air cooling was a feature of the design with dry air coolers located on the roof of the mech building. A standard boiler plant was installed to take up load when required and also used for the initial cold start of the plant.